AGP Picks
View all

Design Phase Finished for Flagler Avenue Roadway and Drainage Improvements

News originally published by

Miami-Dade County - Florida

Monroe County, in conjunction with the City of Key West, is planning a major roadway and stormwater improvement project along Flagler Avenue in Key West, supported by a recently awarded $22.05 million in Florida Department of Environmental Protection (DEP) Resilient Florida grant funding and $60.5 million in federal grant funding, administered through the Florida Division of Emergency Management (FDEM). The project will improve drainage, address flooding concerns, and strengthen the roadway's resilience to future storm events and rising waters.

Flagler Avenue is a major roadway that provides island access for residents and visitors.

The project design and permitting are complete. The county submitted the design plans, the hydrologic study, and stormwater modeling information to FDEM for review in May 2026. FDEM will perform a benefit-cost analysis to confirm the project is cost-beneficial before releasing any construction funding.

The project will reconstruct approximately two miles of Flagler Avenue from South Roosevelt Boulevard to 1st Street by replacing the existing limerock roadway base with a more durable asphalt base. The project will also upgrade the existing gravity drainage system, which no longer functions properly with king tides, to a closed drainage system designed to improve stormwater collection and management. The new closed system will not be impacted by king tides and heavy rainfall, as it won’t drain to outfalls.

Major improvements outlined in the project include:

  • Installation of two stormwater pump stations and stormwater collection systems.
  • Installation of approximately 3,400 linear feet of force main and 18 injection wells.
  • Construction of approximately 0.24 acres of nature-based stormwater attenuation areas within city rights-of-way.
  • Replace sidewalks affected by construction and adjust adjacent properties to accommodate new sidewalk slopes.
  • Coordination with utility providers for necessary adjustments and relocations.

"Improving our roads and drainage infrastructure is essential as we continue to address flooding challenges and prepare for the impacts of rising water levels,” said Monroe County Administrator Christine Hurley. “This project is a demonstration of how the county can partner with its cities to provide more resilient infrastructure.”

Contingent upon available funding and subject to city commission approval, the City of Key West will manage and fund the long-term maintenance of the drainage and pump stations.

Construction is tentatively planned to begin in mid-2027. The county will announce and hold a public meeting before construction begins.

“We are proud of the county staff that secured these grant funds and appreciate our state and federal partnerships in helping fund these important improvements," said Hurley.

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Share this page:

Advanced Search Options

Search for:

Search scope:

Type:

Search in:

Date range:

The last

Sort by:

Sign up for:

The Global Jobs Bank

The daily local news briefing you can trust. Every day. Subscribe now.

By signing up, you agree to our Terms & Conditions.